We set the standard in traffic and transportation engineering, providing detailed designs and impact studies for both urban and rural projects. Our expert team ensures every plan is optimized for safety, flow, and compliance, giving you actionable insights for effective decision-making.

Transportation Design Services

  • Horizontal & Vertical Roadway Geometry
  • Corridor Assemblies & Modeling
  • Roadway Earthwork Calculation
  • Roadway Drainage & Hydraulics
  • Plan & Profile Sheets Preparation
  • Erosion and Sediment Control Design
  • Roadway Cross Sections

Traffic Planning Services

  • Traffic Analysis and Studies
  • Traffic Modeling and Simulation
  • Traffic Signal Design and Optimization
  • Pedestrian and Bicycle Facility Design
  • Intersection Capacity Evaluation
  • Detour Design
  • Report and Recommendations

Areas of Expertise

  • Design and Analysis
  • Intersection design
  • Interchanges
  • Utility Coordination & Relocation
  • Traffic Impact Studies
  • Signal Warrant Analysis
  • Roundabout Analysis
  • GDOT ICE study

Project Highlights

0

+

Miles Roadway Design Drafting

0

+

Roundabout Design for GDOT

0

+

Miles Road Survey Drafting cumulatively in CA, NJ, WA

  • 10+ Intersection Design cumulatively for GDOT, NCDOT, SCDOT
  • 30+ TIS cumulatively for GDOT, TDOT, SCDOT
  • 10+ Warrant Analysis cumulatively for GDOT, TDOT, SCDOT
  • 15+ Detour plans for GDOT
  • Roundabout Analysis for GDOT
  • ICE Analysis for GDOT

Softwares we use

01

Project 1- Roundabout Design

Project Area

0.87 acres

Input

Topographic Survey of Site with concept plan and tiff images

Output

Roundabout Design using AutoCAD Civil 3D (in .dwg format) for the location with proposed Geometry, Grading and possible Utility changes according to county and DOT standards.

02

Project 2- Roadway Design

This project involves the design of a 0.5-mile roadway located in Marion County.

Our team handled the entire design process, from geometric layout to utility design, and produced the complete construction plan set.

03

Project 3- A Traffic Impact Study (TIS)

Project Area

1,370 Acres Land use: Residential, Commercial, Institutional (Mixed-use)

Input

Existing Traffic Counts, Trip Generation, Trip Distribution, Site Plan

Output

Developed traffic models for Existing, No-Build, Build, and Design Years using SYNCHRO 11. Conducted capacity analysis for AM and PM peaks, existing plus project, and a 5-year horizon projection. Assessed intersections under stop control and signalized conditions and performed Signal Warrant Analysis.